Kitchen Reno - Day 1 Monday May 25, 2009, 0 comments

Trash

That was our kitchen on the day we took possession of the house – a week and a half ago. We already knew we’d be renovating the kitchen. 4 sq ft of counter space just won’t work if one actually cooks in one’s kitchen.

Unfortunately the amazing fridge didn’t stay with the house. Probably not a bad thing, since it probably uses more hydro by itself in a month than we currently do.

So, the white lino tiles, the floral wallpaper, the mahogany veneered 1960s bank of cupboards, and the formica backsplash had to go. That’s what we started yesterday

Trash

At first we started by stripping the wallpaper. We figured since we were keeping the walls more or less intact, this was the right course of action. Of course, fate decided differently, and when we were about 50% of the way around the kitchen, I discovered the old lino backsplash, which had been smoothed with plaster, then painted, and finally wallpapered over. Peeling it off is not an option (see the patch beside the door in the photo below).

Trash

But the cupboards came down, with only a minor amount of drama. We saved what we could, which largely meant keeping the doors. The rest was buried under so many layers of paint that they unfortunately came out in small pieces.

And we started on the floors, by stripping the white lino tiles and the plywood underlay. I type this in one sentence, but I have a second to add: 10,000 nails. It all came up, revealing the amazing fluorescent green underneath, and eventually the original grey lino tiles and another layer of plywood underlay.

So we started peeling that up. This proved incredibly difficult and time consuming, but we’ve got about 75% of the floor down to the original subflooring.

Trash

Next step is the remainder of the tile/subfloor removal, and then the exciting bit – taking the plaster and lathe walls and ceiling back to studs so the outside wall can be insulated, the wiring and plumbing moved, and new drywall installed.

These are the joys of home ownership!


Comments

Commenting has ended for this post, but I'd still love to hear from you.

The website of Adrian Lebar

A Rain of Frogs is written, designed and built by Adrian Lebar. As a sixteen year veteran of web design and development, the Internet is his canvas, interface design, typography, usability, accessibility, XHTML and CSS are his tools.

He is a father, sailor, snowboarder, skier, cyclist, aspiring writer, artist, classically trained musician and afraid of heights.

Adrian is not currently available for freelance and contract work. Learn more.

Perfection is not achieved when there is nothing more to add, but rather when there is nothing more which can be taken away.”
- Antoine de St Exupery

A Rain of Frogs on twitter

  • Back in the t-dot. Nice to be home. 1 day ago
  • Last morning in Boston. Back to Toronto tonight. 1 day ago
  • Phil said 6 more weeks but cherry trees in DC are seriously blooming. 2 days ago
  • @stephen_sills not as many as I'd like, since it's dark when I'm done work. Still I have a few. 2 days ago
  • @stephen_sills boston is awesome. Love it here. Nice small city. Cool restaurants. 3 days ago
  • Boston day 3. Sill really warm. 3 days ago
  • Day 2 in Boston. Still nicer weather than Toronto. Tried some local beer last night. 'harpoon' they call it. V tasty. 4 days ago
  • Boston is nice.
    Not too cold so far.
    5 days ago
  • At the island airport, waiting to board for Boston. First time in the new terminal. Looks great. 6 days ago
  • God, I love Aardman. http://t.co/b5bg66Qv Jan 27th